摘要
结合具体工程实例,通过对两种高墩施工方案进行比选,从施工安全、施工质量及经济等方面进行了论述,采用无拉杆、无落地支架整体模板的施工方法,解决了桥梁高墩施工中安全、墩身外观质量及经济等相关问题。
Combined with specific engineering.example, through alternative choosing two high pier constructions planning, construction safety, construction quality and economy were discussed. The related problems of bridge high pier construction safety, pier body appearance quality and economy were resolved with un-braced, un-floor stand integral board construction method.
出处
《山西建筑》
2009年第5期330-331,共2页
Shanxi Architecture
关键词
桥梁
高墩
施工方案
钢筋
模板
bridge, high pier, construction planning, concrete iron, board