期刊文献+

自由设站在高速铁路轨道精调测量中的应用研究 被引量:4

Application Research of Total Station Free-Stationing in Track Adjustment Measurement of High-Railway
下载PDF
导出
摘要 在利用无砟轨道铺设时建立的CPⅢ控制网点,用全站仪自由设站后方边角交会进行轨道精调测量。以全站仪自由设站后方边角交会的斜距、水平方向和天顶距为观测量,推导了自由设站严密平差计算的数学模型,确定全站仪中心三维坐标的测量原理,数据处理和实现方法。并使用(Embedded VisualC++)EVC4.0+SP2结合TOPCON GTS内部通讯接口进行了系统的编程实现。 Track adjustment measurement of high-railway is done in this paper by the method of free stationing with the points of CP III around the ballastless track. Building strict adjustment model of free stationing, computing the of total station, and data processing are researched on the base of slope-distance, horizontal direction and zenith angle as observations collected by freestationing. The model is realized through Embedded Visual C++ on TOPCON GTS.
出处 《工程建设与设计》 2009年第2期82-85,共4页 Construction & Design for Engineering
关键词 自由设站 铁路轨道 观测量 精调 应用 全站仪 控制网点 轨道铺设 free-stationing track adjustment measurement ofhigh-railway base-piles control points Ⅲ
  • 相关文献

参考文献2

二级参考文献3

共引文献18

同被引文献25

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部