摘要 以沉管灌注桩基础工程施工监理过程为例,总结了沉管灌注桩工程监理要点,并对沉管灌注桩施工监理中曾遇到的问题进行了分析,探讨了沉管灌注桩质量判定方法,期望能对沉管灌注桩基础工程施工监理提供一些借鉴。 The article has taken that the heavy tube pours pole foundation project construction inspection and control process as example, has summed up the heavy tube pouring the pole project inspection and control essential, problem having come across has carried out analysis on to sinking a tube pouring a pole and in the inspection and control being under construction, has discussed the inspection and control being under construction sinking a tube pouting pole mass decision method, expecting to be able to pour the pole foundation project to heavy tube providing a few drawing lessons.
作者 汪振军
出处 《工程建设与设计》 2009年第2期113-115,共3页 Construction & Design for Engineering
关键词 分部工程 沉管灌注桩 工程监理要点 质量判定 subsection project the heavy tube pours a pole project inspection and control essential mass decides
  • 相关文献

参考文献4

  • 1GB50300-2001.建筑工程施工质量验收统一标准[S].[S].,..
  • 2李慧强.建设工程监理[M].北京:中国建筑工业出版社,2003.
  • 3应慧清.土木工程施工[M].北京:高等教育出版社,2004.
  • 4GB50202-2002.建筑地基基础工程施工质量验收规范[S].[S].,..