工程管理集成系统在工程公司项目管理中的应用

APPLICATION OF THE PROJECT MANAGEMENT IN THE EGINEERING CORPORATION WITH NIPRO
下载PDF
导出
摘要 基于PowerOn软件的北京国电华北电力工程有限公司的工程管理集成系统(NIPRO)在单项目及公司级多项目应用情况。从前期项目实施规划到最后的实施结果,对合同管理、费用管理、支付管理、采购管理等一系列业务模块的应用程度、实施成果和基于项目层数据展开的企业级应用进行了介绍。 This article mainly introduced North China Power Engineering (Beijing) company's project management integrative system (NIPRO) in the single project and the company level multi-project application situation, which based on PowerOn software. Plans from the preliminary project implementation to the final implementation result, to the contract management, the expense management, the payment management, the purchase management and so on a series of service module application degree and the implementation achievement has carried on the full detail introduction, and to the enterprise application which launched based on the project level data has carded on the introduction.
作者 王有
出处 《中国勘察设计》 2009年第1期42-44,共3页 China Engineering Consulting
关键词 工程管理集成系统 PowerOn系统 公司级多项目应用 NIPRO powerOn system company level multi-project application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部