摘要
从接触网大修更换承力索施工中,总结影响承力索倒接后b值控制以及腕臂发生偏移的因素,并找出解决办法。对类似大修换线施工和新建电气化铁道承力索架设提供了思路和方法。
It is summed up that OCS overhaul construction and the centenary replacement, problem from the b value controlled and the cantilever dispersion. It is provided the idea construction of overhaul and new electric railway and find solutions to the and way to the similar
出处
《电气化铁道》
2009年第1期33-35,共3页
Electric Railway
关键词
接触网
B值
腕臂偏移
施工
OCS
the b value
cantilever dispersion
construction