摘要 为了探寻人工快速渗滤系统脱氮的机理,采用人工试验土柱模拟人工快速渗滤系统,通过监测不同高度出水中的氨氮、硝态氮和总氮的浓度,得到了其随高度的变化规律。试验结果表明:人工试验土柱中填料层0~1200mm段氨氮的去除率很高,约占总去除率95%,深度越浅氨氮降解效率越高,深度越大氨氮降解效率越低;填料层中900mm处,硝态氮达到最大值14.08~15.06mg·L-1,在兼氧段(900~1200mm)和厌氧段(1200~1500mm)硝态氮浓度下降仅10%左右;出水总氮浓度16.50~21.85mg·L-1,去除率为28.35%~29.78%。 In order to understand the nitrogen removal mechanism, the variation law of the ammonia, nitrate and total nitrogen concentration with height is obtained by monitoring their concentrations of the simulated soil column effluent from the different outlets instead of CRI system. The results demon- strated that the ammonia nitrogen removal rate is about 95% of the total one, in the section of 0-900 mm the infiltration media in the simulated soil column. The shallower its height, the higher the ammonia nitrogen removal rate is. The nitrate nitrogen concentration reaches the maximums, 14.08-15.06 mg· L^-1; In the facultative anaerobic(900-1200 mm) and anaerobic (1 200-1 500 mm) sections, the descent range of nitrate nitrogen concentration is 10% of its maximum, and the total nitrogen concentration of the effluent 16.50-21.85 mg·L^-1 , its removal rate is only 28.35%-29.78%.
出处 《水处理技术》 CAS CSCD 北大核心 2009年第2期32-34,57,共4页 Technology of Water Treatment
基金 “十一五”国家科技支撑计划重点项目(2006BAD01B08-03) 四川省科技攻关计划课题项目(2006Z10-009)
关键词 人工快速渗滤系统 脱氮 硝化 反硝化 constructed rapid infiltration system nitrogen removal nitration denitrification
  • 相关文献

参考文献8

二级参考文献88

共引文献129

同被引文献61

引证文献6

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部