介绍了邹县发电厂三期工程污水站的调试情况并对生活污水和含油废水处理系统进行了相应的评价。
This paper introduces the commissioning of sewage treatment station in third phase of Zouxian Power Plant and appreciation for the system of domestic sewage treatment and oil wastewater treatment.