基于±800kV直流输电工程的水电站装机容量模糊综合评价方法研究 被引量:1

Study on fuzzy synthetically evaluation method based on the installation capacity of hydropower stations of the ±800 kV UHVDC project
下载PDF
导出
摘要 水电站装机容量的选择是一个多参数,多因素评价的综合决策问题,为了克服选择过程中的不确定性问题,引入模糊综合评价方法。以马吉水电站为例,对水电站装机容量为3600MW、3900MW、4 200 MW和4 500 MW这4个方案,从输电系统成本角度,运用模糊综合评价方法,综合分析各种方案的技术经济因素,最后得出4 500 MW为马吉水电站的最优装机容量。 Choosing installed capacity of hydropower station is actually a decisive problem to evaluate muhi-parameters, muhi-factors, and multi-attributes. In order to overcome the uncertainty during the process of selection, the fuzzy synthetically evaluation method was introduced. Then take the Ma'ji hydropower plant as an example, an economic comparison was made between four schemes respectively, 3 600 MW, 3 900 MW, 4 200 MW and 4 500 MW. Through the method in view of the transmission cost, the 4 500 MW scheme is considered the best decision.
出处 《中国电力》 CSCD 北大核心 2009年第2期14-18,共5页 Electric Power
基金 国家自然科学基金资助项目(70671041 70771039)
关键词 特高压直流 装机容量 模糊综合评价法 UHVDC installed capacity fuzzy synthetically evaluation method
  • 相关文献

参考文献3

二级参考文献2

共引文献14

同被引文献13

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部