期刊文献+

武汉火车站屋盖与雨棚平均风荷载的数值模拟 被引量:6

Numerical simulation of mean wind pressure on roof and canopy of Wuhan railway station
原文传递
导出
摘要 基于Fluent6.1软件,将Realizable κ-ε湍流模型与非平衡壁面函数搭配使用,对武汉火车站站房屋盖、雨棚的平均风荷载进行了计算流体力学数值模拟。将数值模拟与风洞试验的结果进行了对比分析,结果具有很好的一致性。应用多孔介质阶跃模型模拟雨棚下表面的穿孔管吊顶,弥补了风洞试验模拟此类结构时测压点布置的局限。 Based on Fluent6.1 soft platform with the realizable turbulence closure model and non-equilibrium Wall Functions, mean wind pressure of the roof and canopy of Wuhan railway station were simulated by computational fluid dynamics method. Comparison of the results between the computation and the wind tunnel test was performed, and the result indicated that the computation result coincided well with the wind tunnel test. Porous jump conditions were used to model perforated tube ceiling of the canopy. This method played the role of the supplement to the wind tunnel test, which had difficulty to dispose pressure taps on the surface of such material.
出处 《建筑结构》 CSCD 北大核心 2009年第1期20-22,15,共4页 Building Structure
关键词 数值模拟 平均风荷载 多孔介质阶跃模型 numerical simulation mean wind pressure porous jump conditions
  • 相关文献

参考文献8

二级参考文献32

  • 1黄振宇,徐文灿,毛鸿羽.喷管流场及其推力矢量的数值计算[J].兵工学报,2000,21(1):31-34. 被引量:12
  • 2周毅,黄鹏,顾明.上海铁路南站屋盖表面风压特性试验研究[J].建筑结构,2007,37(2):118-120. 被引量:6
  • 3何连华,符龙彪,郑冰心,李敬学.盐城火车站无站台柱雨棚风荷载的风洞试验研究[J].铁道建筑,2007,47(7):103-105. 被引量:3
  • 4顾明.上海南站工程风荷载和响应研究[R].上海:同济大学土木工程防灾国家重点实验室,2002..
  • 5吴江航 彭高柱 杨立新 等.土木工程结构数值风洞的风压模拟[A]..大型复杂结构体系的关键科学问题及设计理论研究论文集[C].大连:大连理工大学出版社,1999.75-82.
  • 6陈凯,魏庆鼎,朱凤荣,等.镂空材料对建筑物表面风荷载的影响[C]//第十三届全国结构风工程学术会议论文集,2007.
  • 7[5]Anderson J D,Anderson J,David J.Computational fluid dynamics[M].北京:清华大学出版社,2002.
  • 8[8]FLUENT I. FLUENT User Guide 1,2,3,4[M]. FLUENT INC.,1998.
  • 9[9]帕坦卡 S V.传热与流体流动的数值计算[M].北京:科学出版社,1983.
  • 10[10]FERZIGER J H, PERIC M. Computational Methods for Fluid Dynamics[M]. Springer, 1999.

共引文献1341

同被引文献28

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部