期刊文献+

考虑多因素的集成库存模型及其优化解 被引量:1

Integrated Inventory Model and Its Optimal Solution with Several Factors Considerations
原文传递
导出
摘要 在提前期与质量水平可控且需求分布形式未知的情况下,研究了有顾客流失的单买方单卖方联合期望总成本最小化问题。将订购批量、生产过程失控概率、安全系数、提前期和运送批次作为决策变量,建立了一套库存决策模型和求解算法,并与Ouyang等(2006)的求解结果进行了比较。比较证明,所求得的系统总成本是分布情况未知时所能求得的最优总成本,它大于正态分布下的系统总成本。 The minimum problem of the single-vendor single-buyer's total expected cost involving controllable lead time, quality improvement and lost sale with a free distribution was considered. By taking order quantity, probability of production process out of control, safety factor, lead time and number of lots as decisional variants, the paper presented an inventory decision model and algorithm and compared its solution with Ouyang et al (2006) inventory model through a numerical example. Numerical evidence suggests that joint total expected cost that is derived in the paper is the optimal cost when the distribution function of lead time demand is unknown, and it is greater than the one in the normal distribution case.
出处 《工业工程与管理》 北大核心 2009年第1期48-52,共5页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(70572103) 国家自然科学基金重点项目(70732003)
关键词 集成库存模型 提前期可控 质量水平可控 顾客流失 分布未知 integrated inventory model sale distribution free controllable lead time quality improvement lost
  • 相关文献

参考文献10

  • 1Goyal S K. An integrated inventory model for a single supplier single customer problem [J]. International Journal of Production Research, 1976,15 : 107-111.
  • 2Hill R M. The optimal production and shipment policy for a single-vendor single-buyer integrated production inventory problem[J]. International Journal of Production Research, 1999, 37:2463-2475
  • 3Liao C J,Shyu C H. An analytical determination of lead time with normal demand[J]. International Journal of Operations Production Management, 1991,11 : 72-78.
  • 4Ouyang L Y, Wu K S, Ho C H. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time[J]. International Journal of Production Economics, 2004, 92:255-266.
  • 5Ouyang L Y, Wu K S, Ho C H. An integrated vendor-buyer inventory model with quality improvement and lead time reduction[J]. International Journal of Production Economics, 2007,108:349-358.
  • 6Porteus E L. Optimal lot sizing, process quality improvement and setup cost reduction[J]. Operations Research, 1986, 34: 137-44.
  • 7Rosenblatt M J, Lee H L. Economic production cycles with imperfect production processes[J], lie Transitions, 1986,18:48 55.
  • 8Scarf H. A min-max solution of an inventory problem[M]. In Arrow,K. J. , Karlin S, and Scarf H, editors, Studies in the Mathematical Theory of Inventory and Production, Stanford University Press, 1958 : 201-209.
  • 9Gallego G,Moon I. The distribution free newsboy problem: Review and extensions [J]. Journal of the Operational Research Society, 1993,44 (8) : 825-834.
  • 10Hall R W. Zero Inventories [ M]. Dow Jones-Irwin, Illinois: Homewood, 1983.

同被引文献22

  • 1戴更新,侯云章,于庆东.基于随机提前期的二级库存系统的优化方法[J].数学的实践与认识,2006,36(3):52-57. 被引量:11
  • 2宋华明,马士华.二阶段供应链中提前期压缩的影响与协调[J].管理科学学报,2007,10(1):46-53. 被引量:35
  • 3刘蕾,罗华,唐小我.基于斯坦克尔伯格博弈的订货提前期决策研究[J].计算机集成制造系统,2007,13(7):1401-1405. 被引量:6
  • 4Kaplan R. A dynamic inventory model with stochastiC lead times [J]. Management Science, 1970, 16 (7): 491-507.
  • 5Ehrhardt R. (s, S) Policies for a Dynamic Inventory Model with Stochastic Lead Times[J]. Operations Research, 1984, 32 (1): 121-132.
  • 6Liberatore M. Planning horizons for a stochastic lead-time inventory model [J]. Operations Research, 1977, 25 (6): 977-988.
  • 7Nevison C, Burstein M. The dynamic lot-size model with stochastic lead times [J].Management Science, 1984, 30 (1): 100-109.
  • 8Alp O, Erkip N, Gullu R. Optimal lot-sizing/vehicle-dispatching policies under stochastic lead times and stepwise fixed costs [J]. Operations Research, 2003, 51 (1): 160-166.
  • 9Berman O, Kim E. Dynamic inventory strategies for profit maximization in a service facility with stochastic service, demand and lead time [J]. Mathematical Methods of Operations Research, 2004, 60(3): 497-521.
  • 10Chatfield D C, Kim J G, Harrison T P, Hayya J C. The Bullwhip Effect - Impact of stochastic lead time, information quality, and information sharing: A simulation study[J]. Production and Operations Management, 2004, 13 (4): 340-353.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部