大口径瓦斯抽放井施工工艺 被引量:11

Construction Technology of Large Diameter Gas Drainage Wells
下载PDF
导出
摘要 瓦斯抽放孔要求井斜小,孔径大,下入的井管重量大。以实例介绍了使用GZ-2000型钻机在某煤矿瓦斯抽放站成功施工深400m,直径Ф690mm瓦斯抽放井的施工工艺。在施工过程中采用Ф216mm牙轮钻头+满眼钻具和钟摆钻具施工先导井眼,再采用Ф410mm、Ф690mm组合牙轮钻头+塔式钻具分级扩眼,使用电子多点测斜仪及时监测井斜变化,用钟摆钻具组合进行纠斜,在Ф426mm管体上设置三组镶焊合金的肋骨条做成圆井器来进行圆井,在管体底部设置浮力阀,合理掏空以减少井管重量,确保了工程质量。 Small well deviation, large diameter and heavy well type lowering are required by the gas drainage wells. Examples introduced gas drainage well construction technology by the use of GZ-2000 drill rig drilled a 400m depth, φ690mm for a coalmine gas drainage station. During construction, a pilot well drilled by φ216mm roller bit, packed hole assembly and pendulum assembly, then φ410mm, φ690mm assembled roller bits and tapered drill string reaming in tandem. Well deviation is monitored by multipoint electronic inclinometer; hole straightening by pendulum assembly; well rounded out by a rounder made of φ426mm pipe set on three sets of carbide ribs; a buoyant valve has set on the bottom of the pipe and reasonable hollow out to reduce pipe weight thus ensure to construction quality.
出处 《中国煤炭地质》 2009年第1期65-66,70,共3页 Coal Geology of China
关键词 大口径 瓦斯抽放井 成井工艺 large diameter gas drainage well well completion technology
  • 相关文献

参考文献1

二级参考文献10

共引文献19

同被引文献113

引证文献11

二级引证文献107

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部