摘要 目前我国道路交通特别是高速客运专线飞速发展,桥梁工程大幅增加,箱梁用量也随之大增,其对建设成本的影响不容小视。为合理选择箱梁的施工工艺,运用投资成本分析法对箱梁先张法和后张法造价的影响因素和经济技术指标进行研究。 At present road traffic especially high speed passenger dedicated lines are rapidly developed in our country. Bridge works are increased by a big margin with box girders augmented also greatly, of which the influence on the construction cost cannot be overlooked whatsoever. To reasonably select the construction technology of box girders, a research is conducted by making use of the investment cost analysis method in the influencing factors and techno - economic indexes of the pre - tensioning and post - tensioning methods of box girders.
作者 颜嘉
出处 《铁路工程造价管理》 2009年第1期31-34,共4页 Railway Engineering Cost Management
关键词 箱梁 先张法 后张法 经济评价 Box girder pre - tensioning method post - tensioning method economic evaluation
  • 相关文献

参考文献4

二级参考文献1

共引文献17

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部