基于CBR和FMEA知识模型的产品保证成本预测方法研究 被引量:3

Study on Method of Product Warranty Cost Estimation Based on CBR and FMEA Knowledge Model
下载PDF
导出
摘要 为了满足产品设计阶段数据信息少、参数不确定条件下产品保证成本预测的要求,提出了基于CBR和FMEA知识模型的保证成本预测方法,通过事例推理的方法从事例库中检索最相似事例来预测新产品的保证成本。重点研究了基于FMEA知识模型的事例库组织模型和基于模拟退火算法的事例权重优化方法,提高了事例的检索效率和准确度。最后通过一个实例证明了该方法的有效性。 To satisfy the requirement of the product warranty cost estimation with less and uncertain information in the design stage, this article present the Method of Product Warranty Cost Estimation Based on CBR and FM EA Knowledge Model, which can estimate the warranty cost of new product in design stage based on the whole selected the most similar cased from the case database by means of case-based reasoning. It focuses on the organization model of the case database based on FM EA knowledge model and the optimization of the feature weight based on simulating stealing algorithm, which can improve the efficiency and accuracy of case retrieval. Finally, an example was applied to verify the validity of the method.
作者 门峰 刘子先
出处 《组合机床与自动化加工技术》 北大核心 2009年第2期8-11,共4页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金项目资助(70671071)
关键词 保证成本 事例推理 FMEA知识模型 模拟退火算法 warranty cost case-based reasoning FM EA knowledge model simulating stealing algorithm
  • 相关文献

参考文献13

二级参考文献52

  • 1孙宇,彭强,张晓阳,陆宝春.基于混合结构树的故障诊断技术研究[J].计算机集成制造系统,2005,11(7):1030-1033. 被引量:6
  • 2许勇顺.基于CBR的辅助注塑模设计决策专家系统研究与实现[M].上海:上海交通大学,1998..
  • 3Henrique S H,Carlos E P, Reinaldo C S. Neural networks for short-term load forecasting., a review and evaluation[J]. IEEE Transactions on Power Systems,2001,16(1) : 44-55.
  • 4Agnar A, Enric P. Case-based reasoning: foundational issues, methodological variations, and system approaches[J]. AICOM, 1994,3(1) :39-59.
  • 5Kalyan M G, Ali R M. Empirical evaluation of retrieval in case-based reasoning systems using modified cosine matching function [J]. IEEE Transactions on: Systems, Man, and Cybernetics: Systems and Humans,1997,9(5) : 601-612.
  • 6Bakirtzls A G, Petridls V, Klartzis S J, et al. A neural network short term load forecasting model for the Greek power system[J]. IEEE Transactions on Power Systems, 1996,11 (2) : 858-863.
  • 7戴同.CAD/CAPP/CAM基础教程[M].北京:机械工业出版社,1997..
  • 8BOOTHROYD G, DEWHURST P, KNIGHT W. Product design for manufacture and assembly[M]. NY: Marcel Dekker, 1994.
  • 9G·曼格斯 P·默兰.塑料注射成型模具的设计与制造[M].北京:中国轻工业出版社,1993..
  • 10WANG C, WANG D. The single machine ready time scheduling problem with fuzzy processing times[J]. Fuzzy Sets and Systems, 2002,127(2): 117- 129.

共引文献220