期刊文献+

某路堑高边坡滑坡治理工程实践 被引量:2

Practice in Treatment of Landslide for Road Cut High Slope
下载PDF
导出
摘要 介绍了某城市环路桩号1K+360-1K+560路堑高边坡滑坡治理的设计概况和综合治理方案。本治理工程中采用了预应力抗滑桩和压力分散型锚索等结构,结合边坡地表排水、坡体排水、坡面植被防护等综合防护措施,达到了安全可靠、经济合理的目的。本文对类似工程有一定的借鉴作用。 In this paper,the design method and compressive managing scheme in treatment of landslide for Road cut high slope - from 1K+360-1K+560 in a city hoop road are introduced. Prestressed anti--slide pile and prestressed anchor cable with dispersive pressure are used in the project, combining the side sloe pe earth's surface water discharge, the ascent body water dis- charge, and the vegetation protecting in lave of slope.., etc, it's safety, credibility, economy and reasonable. This paper definitely draws lessons to the similar engineering.
作者 赵剑豪
出处 《福建建设科技》 2009年第1期1-4,共4页 Fujian Construction Science & Technology
关键词 路堑高边坡 压力分散型锚索 预应力抗滑桩 动态设计 Road cut high slope Prestressed anchor cable with dispersive pressure Prestressed anti--slide pile Dynamic design
  • 相关文献

参考文献1

  • 1JTG D30-2004.公路路基设计规范[S],2004.

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部