摘要
本文结合福建省某高路堤边坡锚定板挡墙工程,介绍锚拉桩基础锚定板挡墙在临近已建挡墙之上填方加高边坡的应用和设计方法。为避免新填筑边坡填土荷载对下方临近已建支挡结构的影响,锚定板挡墙可采用锚拉桩基础卸除附加土压力。实践证明这是一种技术可行且经济合理的方法。
Combined with a high bank slope anchor breast wall project, the application and design method of anchor breast wall used in heightening slope filling near existing retain wall is introduced. The anchorage tensile pile foundation is used to avoid the influ- ence of load on existing structure by new filled soil, which had proved to be a feasible and economic method.
出处
《福建建设科技》
2009年第1期15-16,32,共3页
Fujian Construction Science & Technology
关键词
锚拉桩
锚定板档墙
应用
anchorage tensile pile
anchor breast wall
application