期刊文献+

不确定环境下虚拟企业生产计划多目标优化模型研究 被引量:2

The Study of Multi-objective Model of Production Plan for VE under Uncertain Condition
下载PDF
导出
摘要 针对不确定环境下的虚拟企业生产计划的特点,建立了其详细的多目标优化数学模型。当模型中的模糊变量是梯形模糊数时,可利用可行性规划理论将模糊模型转化为清晰等价式,并采用改进的NSGA-Ⅱ算法给出了求解模型的具体步骤,最后通过一个数值算例验证了算法的有效性。 To deal with the special features of virtual enterprise' s production planning,taking into account the uncertain environment, a mathematical model is proposed, which is a detailed and multi-objecive optimization model.The fuzzy model is translated into the crisp equivalence by the reliability programme theory, when fuzzy varibles are characterized by trapezoid fuzzy numbers,and the procedure is given to solve the deterministic models based on the improved NSGA- Ⅱ algorithm.Finally,a numerical example is provided for illustrating the effectiveness of the method.
作者 高阳 罗根
机构地区 中南大学商学院
出处 《组合机床与自动化加工技术》 北大核心 2009年第1期97-100,共4页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金资助项目(70572060) 教育部博士点基金(20040533057)
关键词 虚拟企业 生产计划 多目标优化 NSGA-Ⅱ算法 virtual enterprise production planning multi-objecive optimization NSGA-Ⅱ algorithm
  • 相关文献

参考文献15

二级参考文献83

  • 1王建学,王锡凡,陈皓勇,王秀丽.基于协同进化法的电力系统无功优化[J].中国电机工程学报,2004,24(9):124-129. 被引量:76
  • 2金锋,吴澄.大规模生产调度问题的研究现状与展望[J].计算机集成制造系统,2006,12(2):161-168. 被引量:34
  • 3师瑞峰,周泓,上官春霞.混合递进多目标进化算法及其在flow shop排序中的应用[J].系统工程理论与实践,2006,26(8):101-108. 被引量:8
  • 4Hancock P J B. An empirical comparison of selection methods in evolutionary algorithm[A]. Evolutionary Computing: AISB Workshop[C]. Berlin: Springer-Verlag, 1994. 80-94.
  • 5Thomas Fritsch, Kurt Tutschku, Kenji Leibnitz. Field strength prediction by ray-tracing for adaptive base station positioning in mobile communication networks[A].2nd ITG Conf on Mobile Communication'95 [C]. Neu Ulm, 1995. 135-139.
  • 6Kurt Tutschku, Notker Gerlich, Phuoc Tran-Gia. An integrated approach to cellular network planning[A].7th Int Telecommunication Network Planning Symp[C]. Sydney, 1996.
  • 7Calegari P, Cuidec F, Kuonen P, et al. Genetic approach to radio network optimization for mobile systems[A]. Proc IEEE VTC'97[C]. Phoenix, 1997.2:755-759.
  • 8Jin K H. Genetic approach with a new representation for base station placement in mobile communications[A].Proc IEEE VTC'01[C]. Atlantic, 2001. 860-864.
  • 9Zitzler E. Evolutionary Algorithms for Multiobjective Optimization.. Methods and Applications[M]. Shaker Verlag, 1999.11-12.
  • 10Deb K, Agrawal S, Pratap A, et al. A fast elitist nondominated sorting genetic algorithm for multi-objective optimization:NSGA-Ⅱ[A]. Proc of the Parallel Problem Solving from Nature VI Conf[C]. Paris ,2000. 849-858.

共引文献162

同被引文献20

  • 1周威,金以慧.具有模糊缺陷率和订货费用的库存管理研究[J].计算机集成制造系统,2006,12(5):765-771. 被引量:20
  • 2杨善学,王宇平.基于Pareto最优和限制精英的多目标进化算法[J].计算机工程与应用,2007,43(2):108-110. 被引量:4
  • 3苏生,战德臣,李海波,徐晓飞.不确定需求和能力约束下的多目标多工厂生产计划[J].计算机集成制造系统,2007,13(4):692-697. 被引量:11
  • 4Al-- e-- hashem S M J, Malekly H, Aryanezhad M B. A Multi--objective Robust Optimization Model for Multi-- product Multi-- site Aggregate Produc- tion Planning in a Supply Chain Under Uncertainty [J]. International Journal of Production Economics, 2011,134(1) :28-42.
  • 5Aliev R A, Fazlollahi B, Guirimov B G, et al. Fuzzy--genetic Approach to Aggregate Production --distribution Planning in Supply Chain Manage- ment [J]. Information Sciences, 2007, 177 (20) :4241-4255.
  • 6Deb K,Pratap A,Agarwal S, et al. A Fast and Elit- ist Multiobjective Genetic Algorithm: NSGA- II [J]. IEEE Transactions on Evolutionary Computa- tion, 2002,6 (2) :182-197.
  • 7Zhang Wenqiang, Gen M. Process Planning and Scheduling in Distributed Manufacturing System U- sing Multiobjective Genetic Algorithm [J]. IEEE Transactions on Electrical and Electronic Engineer- ing,2010,5(1) ..62-72.
  • 8Cheng Fangqi, Ye Feifan, Yang Jianguo. Multi-- ob- jective Optimization of Collaborative Manufacturing Chain with Time--sequence Constraints [J]. The International Journal of Advanced Manufacturing Technology, 2009,40(9/10) : 1024-1032.
  • 9Srinivas N,Deb K. Multi-- objective Optimization Using Nondominated Sorting in Genetic Algo- rithms[J]. Evolutionary Computation, 1994,2 (3) : 221-248.
  • 10Rosenblatt M J, Lee H L. Economic production cycles with imperfect production process [ J]. IEE Transaction, 1986,18 (1) :48 -55.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部