狮泉河水电站工程施工索赔实践

Claim Indemnity Practice in the Construction of Shiquanhe Hydropower Station Project
下载PDF
导出
摘要 西藏阿里狮泉河水电站工程指挥部在施工管理中,以合同管理为核心加强施工索赔管理,监理部配备了专职造价监理工程师,对合同费用和工程造价进行有效的控制,工程施工索赔工作取得较好的效果。介绍了施工索赔发生的原因,索赔的分类,反索赔及其管理,以及索赔工作的几点体会。 During the project construction management, the Project Construction Headquarters for Shiquanhe Hydropower Station in the Ali of Tibet took the contract management as its core and strengthened the management of construction claim indemnity. Its supervision department arranged professional cost engineer to effectively control the contract cost and project cost. Their claim indemnity work also gained good effectiveness. This paper introduces the reasons for construction claim indemnity, the classitification of construction claim indemnity, anti-claim indenmity and management, and several personal work understandings of claim indemnity.
出处 《水力发电》 北大核心 2008年第12期76-77,86,共3页 Water Power
关键词 工程施工索赔 水电工程建设 狮泉河水电站 claim indemnity in project construction hydropower project construction Shiquanhe Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部