摘要
就狮泉河水电站在技施设计时进行机组台数及单机容量优化调整的原因、调整方案的拟定进行了分析,从优化调整的必要性、动能指标等方面对优化调整前后的方案进行了比较。最终狮泉河水电站机组台数设定为4台,单机容量设定为1 600 kW。
This paper analyzes the cause and decision of adjustment scheme of the number and capacity of generating unit and compares the pre- and post-adjustment optimization of necessities and dynamic indexes in the course of technical design of Shiquanhe Hydropower Station. Finally, the Shiquanhe Hydropower Station adopted the scheme of 4 generating units each with the installed capacity of 1600 kW.
出处
《水力发电》
北大核心
2008年第12期90-91,106,共3页
Water Power
关键词
负荷变化
机组台数
优化调整
狮泉河水电站
change of load
number of generating unit
optimization adjustment
Shiquanhe Hydropower Station