摘要 灯具泄漏电流测试线路中隔离测试变压器次级接地问题直接影响着测试结果的准确性。本文用试验数据和电路理论,分析了泄漏电流测试线路中隔离测试变压器次级接地的必要性,为灯具制造商与仪器制造商以及质检机构提供参考,从而为贯彻GB7000.1-2007《灯具第1部分:一般要求与试验》标准提供指南。 The earthing of secondary circuit of an isolating test transformer on the circuit for luminaire leakage current test strongly influences the accuracy of test results. Depending on the test data and the circuit theory, the article expatiates the necessity of the earthing of secondary circuit of isolating test transformer on leakage current test, to give reference for manufacturers and test houses, and provides the guidance for carrying out the GB 7000.1 -2007 Luminaries-Part 1 :General requirements and tests.
出处 《中国照明电器》 2009年第1期36-39,共4页 China Light & Lighting
关键词 灯具 泄漏电流 隔离测试变压器 接地 luminaire leakage current isolating test transformer earthing
  • 相关文献

参考文献4

  • 1IEC 60990:1999 Methods of measurement of touch current and protective conductor current.
  • 2IEC 60598 - 1:2008 Luminaires-Part 1 :General requirements and tests.
  • 3GB/T12113-2003接触电流和保护导体电流的测量方法.
  • 4GB7000.1-2007《灯具第1部分:一般要求与试验》国家标准宣贯教材.