摘要 介绍杭州湾跨海大桥南航道桥(主跨318 m单塔斜拉桥)主塔的施工,总结大跨度独塔钢箱梁斜拉桥主塔及合龙段的施工技术,重点介绍外加电流阴极防护技术、液压爬模技术以及钢锚箱安装施工技术。 This paper describes the construction of the main pylon of the south channel bridge with a main span of 318m of Hangzhou Bay Sea-Crossing Bridge, closure section of steel box girder cable-stayed bridges with a summarizes the technology of main pylon and its large span , a single pylon and double planes. The inpressed current cathodic protection technique, construction technology of hydraulic climbing formwork, and construction technology of steel anchor housing are especially introduced.
出处 《水运工程》 北大核心 2009年第2期138-145,共8页 Port & Waterway Engineering
关键词 斜拉桥 主塔合龙段 阴极防护 液压爬模 钢锚箱 施工工艺 cable-stayed bridge closure section of main pylon cathodic protection hydraulic climbing formwork steel anchor housing construction technology
  • 相关文献

参考文献6

二级参考文献1

  • 1EN 12696- 2000, CATHODIC PROTECTION OF STEEL IN CONCRETE[S].

共引文献131

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部