斜拉桥运营阶段温度效应分析 被引量:1

The temperature effect analysis of cable stayed bridge operation stage
下载PDF
导出
摘要 以苏通大桥为计算模型,将斜拉桥的温度荷载分解为体系温差、索梁(塔)温差、主梁温度梯度以及主塔的温度梯度来考虑,利用大型通用有限元软件ANSYS研究了斜拉桥运营阶段的温度静力响应,得出了斜拉桥的温度效应不容忽视的结论。 With Sutong Bridge as calculation model, the temperature loading of cable stayed bridge was decomposed into system temperature difference, cable beam temperature difference, main beam temperature gradient and main column temperature gradient, the temperature static response of cable stayed bridge operation stage was studied with large common finite element software ANSYS. It concluded that the temperature effect of cable stayed bridge was not ignored.
作者 邓小伟
出处 《山西建筑》 2009年第7期298-299,共2页 Shanxi Architecture
关键词 斜拉桥 运营阶段 结构体系 温度效应 cable stayed bridge, operation stage, structural system, temperature effect
  • 相关文献

参考文献6

二级参考文献9

  • 1陈德伟,郑信光,项海帆.混凝土斜拉桥的施工控制[J].土木工程学报,1993,26(1):1-11. 被引量:67
  • 2葛耀君,翟东,张国泉.混凝土斜拉桥温度场的试验研究[J].中国公路学报,1996,9(2):76-83. 被引量:69
  • 3范立础.桥梁工程(上册)[M].北京:人民交通出版社,1986.320-327.
  • 4陈德伟 范立础.独塔斜拉桥(广东三水桥)的施工控制.第十二届全国桥梁学术会议论文集[M].上海:同济大学出版社,1996.341-345.
  • 5范立础.预应力混凝土连续梁[M].北京:人民交通出版社,1998..
  • 6滕家俊.混凝土桥梁温度分析计算方法(上)[J].东北公路,1983,17(3):25-41.
  • 7滕家俊.混凝土桥梁温度分析计算方法(续)[J].东北公路,1983,17(4):69-82.
  • 8-.武汉市江汉四桥工程施工过程控制和施工监测关键技术研究课题研究报告[M].武汉:武汉市江汉四桥工程建设指挥部等单位,1999,12.45-51.
  • 9Manabu Ito. Supporting devices of long span cable - stayed bridge girder[A]. Innovative Large Span Structures[C]. Toronto: IASS-CSCE,1992.25-30.

共引文献177

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部