摘要 EPC/交钥匙工程的项目管理是复杂且要求面面俱到的,尤其是到了现场施工阶段,必定与工程当地的各类资源息息相关,因此必须对工程当地的各类资源进行调查研究,分析对工程当地资源依赖的可能性及程度,作出客观的综合评价,为制定和采取相应项目管理措施提供依据。 Project management of EPC & Turn-key project is complicated and comprehensive, which will certainly depends on some kinds of local resources, especially when enters the site construction phase. Therefore, we must survey and analyze local resources, make objective and integrated evaluation to the possibility and degree of the dependence on local resource, thus lay the foundation for making and taking relevant project management measures.
作者 王建铭 谭京
出处 《中国勘察设计》 2009年第2期58-60,共3页 China Engineering Consulting
关键词 EPC 资源 依赖 总承包商 EPC resource dependence general contractor
  • 相关文献

同被引文献35

  • 1刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 2单汨源,龙颖.一种关键链缓冲机制改进方法及其应用研究[J].项目管理技术,2006,4(9):32-35. 被引量:21
  • 3陈安邦,王守清,郑超.对外承包工程案例分析方法框架[J].项目管理技术,2007(1):32-38. 被引量:1
  • 4Yang X P,Gao P.A quantitative research of the time buffer of critical chain project management[C].E-Business and E- Government(ICEE),2011 International Conference on,2011:1-4.
  • 5Peng W L,Xu H.The scheduling problem of active critical chain method[J].Information Technology Journal,2012,I 1(7):829-839.
  • 6Cohen I M,Baum A,Shtub A.Multi-project scheduling and control a process-based comparative study of the critical chain methodology and some alternatives[J].Project Management Journal,2004,35(2):39-50.
  • 7Yu J,Xu Z,Hu C.Buffer sizing approach in critical chain project management under multiresource constraints[C]//Informa- tion Management,Innovation Management and Industrial Engineering(ICIII),20136th International Conference on.IEEE,2013,3:71-75.
  • 8Luong D L,Ario O.Fuzzy critical chain method for project scheduling under resource constraints anduncertainty[J].Int J of Project Management,2008,26(6):688-698.
  • 9Gao P,Feng J W,Wang H T.Grey critical chain project scheduling technique and its application[J].Canadian Social Science,2007,3(3):35-41.
  • 10Ma G F,Li L,Chen Z Q.Research on the buffer sizing approach in critical chain scheduling in perspective of flexible management[M].Springer-Verlag Berlin Heidelberg,2012,143:61-68.

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部