摘要
介绍了10MW高温气冷实验堆工程项目管理系统的初步设计框架。在此基础上,重点介绍了核工程管理信息系统(MIS)和工程监控系统(PMS)的功能设计以及MIS各子系统的功能设计。本文在MIS和决策支持系统(DSS)的开发方法上也作了一些尝试。
A framework of project managment information system(MIS) for 10MW high temperature gas cooled test reactor is introduced.Based on it ,we especially give the design of nuclear project management information system and project monitoring system(PMS).Additionally,a new method of developing MIS and Decision Support System (DSS) has been tried.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1998年第2期117-120,共4页
Nuclear Power Engineering
关键词
高温气冷堆
实验堆
核工程管理
工程监控系统
MW high temperature gas cooled test reactor Nuclear project management Project monitoring system Managment information system