期刊文献+

海岸工程的允许越浪量 被引量:11

Tolerable Overtopping Limits at Coastal Structures
下载PDF
导出
摘要 对于防护海岸陆地的护岸和海堤等,通常并不要求其顶高程在高潮大浪时完全不越浪,而是要求将其越浪量控制在一定的允许范围(允许越浪量)内。为此设计时要计算各式建筑物在不同波浪作用下的越浪量,还要制定允许越浪量的标准。根据国内外对海岸工程的两种允许越浪量的研究,综述已有允许越浪量的主要研究成果,可供工程设计参考。 The overtopping discharge for the protective bank and sea wall of coast and land are required to be controlled within a certain tolerable limit under the condition of high tide and large wave. So, the overtopping discharges for each type of structure under the actions of different waves should be calculated in the design and the standards for the tolerable overtopping limit should be made. The research on two kinds of tolerable overtopping limits for the coastal structures at home and abroad are summarized. Which can be taken as the reference for the works design.
作者 俞聿修
出处 《港工技术》 2009年第1期1-3,共3页 Port Engineering Technology
关键词 允许越浪量 平均越浪量 单波越浪体积 单波越浪峰值体积 tolerable overtopping limit mean wave overtopping discharge single wave overtopping volume peak single wave overtopping volume
  • 相关文献

参考文献9

  • 1Allsop W,Pear T B,Franco L,et al. Safety under Wave Overtopping:How Overtopping Processes and Hazards are Viewed by the Public: Proc.of 29th ICCE,Lisbon September 18-24,2004[C].Reston : ASCE, 2004 : 4263-4275.
  • 2Franco L,de Gerloni M, Van der Meer J W. Wave Overtopping on Vertical and Composite Breakwaters:Proc.of 24th ICCE, Kobe[C]. Reston : ASCE, 1994 : 1030-1045.
  • 3Goda Y.Random Sea and Design of Maritime Structure[M].Tokyo : University of Tokyo Press,1985.
  • 4Sigurdarson S,Viggosson G. Berm Breakwaters in Iceland, Practical Experience : Proc.of Hydro-port' 94, PHRI, Yokosuka[C]. Japan, 1994.
  • 5Krystian W P. Dikes and Revetments Design-Maintenance and Safety Assessment [M].Rotterdam:A. A. Balkema, 1998:43-52.
  • 6U.S.Army Corps of Engineers. Coastal Engineering Manual [M]. Washington D C,USA, 2003.
  • 7Herbert D M. The Overtopping of Seawalls,a Comparison between Prototype and Physical Model Data [M]. Report TR22, HR Wallingford, United Kingdom, 1996.
  • 8Smith G M,Seijffert J W,Van der Meer J W. Erosion and Overtopping of a Grass Dike:Large Scale Model Test:Proc. of 24th ICCE,Kobe[C]. Reston:ASCE, 1994:2639-2652.
  • 9AUsop N W H. Report on Hazard Analysis [M]. CLASH WP6 Report, HR Wallingford, United Kingdom, 2005.

同被引文献85

引证文献11

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部