期刊文献+

浅谈港口建设项目设计阶段工程造价的控制方法 被引量:7

Discussion on Controlling Methods of Investment in Project of Port Works at Stage of Designing
下载PDF
导出
摘要 设计阶段的造价控制对整个工程投资的影响高达75%,故在设计阶段进行造价控制对港口建设项目总投资具有重要意义。介绍设计阶段进行方案优选、实行设计招投标制度、运用价值工程、实行限额设计以及设计监理等主动控制的基本方法,以合理地处理技术与经济之间的对立统一关系,达到节约总投资的目的。 Since it has a deep influence as far as 75% on the total investment of the project of port works,the budget controlling in the design stage thods for controlling the investment actively article such as the optimization of proposals gineering, quota designing, supervision of with handling with the unified and opposite has an important significance in the total investment. Some basic me in the project of port works at the stage of design is expounded in this , the bidding mechanism in the designing stage, by ways of value endesigning and so on. The purpose of economizing the total investment relationship of technology and economy reasonably can be achieved.
出处 《港工技术》 2009年第1期40-42,共3页 Port Engineering Technology
关键词 港口建设项目 工程造价 设计招投标机制 价值工程 限额设计 project of port works engineering cost bidding mechanism in the design stage value engineering quota designing
  • 相关文献

参考文献1

同被引文献13

引证文献7

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部