摘要
运用线性规划方法对资源在不同的实验室间进行配置,使学校实验室建设的效率较高,采用模糊综合评判法对实验室建设的情况进行评价。
The linear programming method is used to distribute the resources in different laboratories. This method makes the laboratory construcion with high efficiency. And the fussy comprehensive assessment is also used for the laboratory construcion assessment.
出处
《实验技术与管理》
CAS
北大核心
2009年第1期159-161,共3页
Experimental Technology and Management
关键词
实验室建设
线性规划
模糊综合评判
laboratory construction
linear programming
fuzzy comprehensive assessment