摘要
铁路客运专线的信号施工与普速铁路的信号施工相比较,无论是施工条件,施工组织方式还是施工工艺,都存在比较大的不同。对这些不同条件下的施工组织方式进行了探讨,为今后客运专线信号工程的施工提供了借鉴。
The conditions, organizational modes and technology processes of the signal constructions of passenger dedicated lines and common railway lines are different. The paper discusses the construction organizational modes in these different conditions, which will be reference to passenger dedicated lines' signal construction in future.
出处
《铁道建筑技术》
2009年第1期65-68,共4页
Railway Construction Technology
关键词
客运专线
信号施工
特殊方案
passenger dedicated lines
signal construction
special schemes