摘要
根据多年施工经验,长螺旋钻管内泵压CFG桩施工技术应用到郑州地区饱和粉土等软土层时,常出现桩周地面沉降、周边建筑物和路面开裂以及管道错位等环境问题。通过对长螺旋钻管内泵压CFG桩施工引起环境问题的机理进行综合分析,提出相应措施,并对长螺旋钻管内泵压CFG桩在饱和粉土等软土层中的适应性作出评价。
According to the years construction experience, when the technology of pump pressure CFG pile in continuous auger drilling pipe is applied in the stratum of saturated clay in Zhengzhou area, a series of environmental problems would come forth, such as ground settlement around piles and adjacent buildings, pavement cracking and pipeline dislocation. By the comprehensive study on the mechanism ofenvironmental problems caused by construction of pump pressure CFG pile in continuous auger drilling pipe, the countermeasures are put forward, and the adaptability evaluation on this technology in saturated silty soil is made.
出处
《探矿工程(岩土钻掘工程)》
2009年第2期24-28,共5页
Exploration Engineering:Rock & Soil Drilling and Tunneling
基金
河南省科技攻关项目"长螺旋钻管内泵压CFG桩复合地基技术在饱和粉土中的适应性研究"(编号:0524450008)
关键词
CFG桩
长螺旋钻管内泵压施工
环境问题
机理分析
应对措施
适应性评价
CFG pile
pump pressure construction in continuous auger drilling pipe
environmental problem
mechanism analysis
countermeasure
adaptability evaluation