摘要
结合广西大型灌溉排水泵站更新改造规划,分析了广西大型泵站的现状,阐述其存在的主要问题,并提出推动广西大型泵站发展的意见和建议。
Combined with the upgrade planning of large-scale irrigation or drainage pump stations in Guangxi,the authors analyzed the current status of large-scale pump stations in Guangxi, presented the major problems,and put forward countermeasures for promoting the development of these pump stations.
出处
《广西水利水电》
2009年第1期59-61,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
大型泵站
现状
发展对策
广西
Large-scale pump station
current status
development countermeasure
Guangxi