摘要
介绍了宣钢炼钢厂百吨炉区除尘系统的工艺流程和改造方案,针对厂房实际情况,本着少投入的原则实现了除尘系统的升级改造,即"OG法除尘",取得了较好效果。
The process and reformation plan of dust collecting system of 110 t converter are introduced. Based on factual condition of plant building and principle of lower cost the "OG dust collection" is realized, good effect got.
出处
《河北冶金》
2009年第1期29-31,54,共4页
Hebei Metallurgy
关键词
转炉
除尘系统
改造
converter
dust collecting system
reformation