某高层建筑结构体系改变综合加固改造技术

Strengthening and Rebuilding Technology on Structure System Change of Some High-rise Building
下载PDF
导出
摘要 常州市某14~28层高层商住楼群由于使用功能变化,需对原结构进行结构体系改变的综合加固,具体做法是先将混凝土框支梁柱采用增大截面法结合外包型钢法进行加固,对局部梁采用增大截面法结合粘钢板法加固,再拆除原有柱间剪力墙。该工程具有作业难度大、技术含量高、特种施工专业性强等特点。本工程施工完成4年多,加固施工完全满足设计改造的要求。 Comprehensive strengthening construction is necessary to change structure system because of functional change of some 14 to 28 stories high-rise buildings in Changzhou. Most of concrete frame beams and columns are strengthened by enlarging section method and epibely profiled steel method. The other beams are strengthened by enlarging section method and bonding steel plate. The shear walls between columns are demolished. The project has some characteristics of difficult construction, high technical contents, strongly professional special construction etc. This project is finished successfully for four years, and satisfies design'request.
出处 《施工技术》 CAS 北大核心 2009年第2期61-64,共4页 Construction Technology
关键词 加固 改造 增大截面 外包型钢 粘钢 静力拆除 strengthening rebuilding enlarging section epibely profiled steel bending steel plate static demolition
  • 相关文献

参考文献2

  • 1四川省建筑科学研究院.CECS25:90混凝土结构加固技术规范[S].北京:中国计划出版社,1992.
  • 2四川省建筑科学研究院.GB50367-2006混凝土结构加固设计规范[S].北京:中国建筑工业出版社,2006.