龙滩水电站水轮机转轮是国内最早在工地制造的大型水轮机转轮之一,文章详细介绍了龙滩转轮工地制造的质量标准、制造检验及验收程序,并对龙滩已交货的转轮主要质量指标以及整体质量进行评价,最后对工地制造转轮提出合理建议,对大型转轮工地制造及检验有一定指导和借鉴意义。
The Longtan runners are the earliest super-large hydroturbine runners manufactured in construction site in China. This paper introduces the quality specification,manufacturing examination and inspection procedure of Longtan runners in detail,reviews the main quality items and the finished runners quality,puts forward rational proposals on manufacturing runners in construction site.
出处
《水电站机电技术》
2009年第1期40-44,共5页
Mechanical & Electrical Technique of Hydropower Station
关键词
水轮机转轮
工地制造
检测
焊接
无损探伤
hydroturbine runner
site manufacture
inspection
welding
non-destructive inspection