摘要
唐湖电厂2台135 MW机组是世界上海拔最高,单机容量最大的机组。文章介绍了唐湖电厂1#炉在调试期间发现主汽温偏差大问题,并进行原因查找、分析及处理全过程。它的顺利投产,为高海拔燃煤机组提供了大量的试验数据。
The 2 × 135 MW unit of Tanghu Themal Power Plant is the largest capaicity and highest elevation in the world. The paper in troduces the main gas temperature large deviation problem in the 1^# boiler of Tanghu Themal Power Plant, and makes investigation, anaylsys and treatment for the reason. After putting into operation, it provicdes nu- merous testing data for the high elevation and coal combustion units.
出处
《青海电力》
2008年第B12期18-20,共3页
Qinghai Electric Power
关键词
火电厂
主汽温
偏差
分析
thermal power plant
main gas temperature
deviation
reason