摘要 通过在深圳电网220kV中航站#1、#3主变保护更换工程中遇到的保护装置控制回路与主变变高开关机构配合问题,说明南瑞继保公司RCS-978保护(CZX-12R2操作箱)与三菱公司220kVGIS组合电器断路器配合出现的断路器操作选择开关、操作箱与机构防跳、操作箱跳合闸电流及操作电源选取的问题,并对施工设计图纸中控制回路不合理的地方提出解决办法。 This paper uses the protection devices reformation engineering of the #1 and #3 transformers in Shenzhen 220kV Zhonghuang substation , puts forward the coordination problems between protection device control circuit and breaker operating mechanism circuit , analyzes the coordination problems in Local-Remote change-over switch, breaker anti-tripping, operating mechanism, choice for operational power supply between CZX-12R2 control circuit in RCS-978 of NARI-RELAYS Company and breaker operating mechanism circuit for 220kV GIS of Mitsubishi Company. Moreover,it gives some improvement measures to above-mentioned problem.
机构地区 深圳供电局
出处 《电力系统保护与控制》 EI CSCD 北大核心 2009年第4期95-100,共6页 Power System Protection and Control
关键词 控制回路 就地远方选择开关 防跳 操作机构 跳合闸电流 control circuit local-remote change-over switch breaker anti-tripping operating mechanism breaker operating current
  • 相关文献

参考文献1

二级参考文献2

共引文献31

同被引文献18

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部