摘要
泵站投资对排涝标准有很大影响,研究排涝标准,必须要研究泵站的投资。但是,对不特定的泵站,无法根据泵站建设的工程量来估算投资。从分析已建泵站装机与投资的关系入手,为新建泵站投资的估算提供依据。
Because of the pumping station investment having very big effect on draining standard, to study draining standard, it is need to study the pumping station investment. However, for a specially appointed pumping station ,we have no Way to estimate its investment according to the project quantity. Based on analysing the relation beteewn the already built pumping station capacity and investment in this paper,and offers a proposal for the project cost of the newly built pumping station.
出处
《中国农村水利水电》
北大核心
2009年第2期86-87,共2页
China Rural Water and Hydropower
基金
湖北省水利厅水利科技重点专项资助项目“湖北平原湖区水灾害综合治理标准与措施研究”的部分相关内容
关键词
平原湖区
大型排水泵站
装机容量
投资
plain lake district
large-scale pumping draining station
capacity
investment