溪洛渡水电站导流隧洞(与尾水洞结合段)设计 被引量:1

Construction diversion tunnel(in combination with tailrace tunnel) design of Xiluodu Hydropower Station
下载PDF
导出
摘要 溪洛渡水电站导流隧洞按左、右岸各3条对称布置,其中1号、2号、5号、6号导流洞与尾水洞结合,过流断面均为,18m×20m(宽×高)的城门洞形,开挖断面最大达21.60m×23.60m,加之缓倾角层间、层内错动带对隧洞顶拱围岩稳定性不利,隧洞工作条件复杂,实施大洞径的导流隧洞并形成永久尾水洞的设计,对设计和施工技术均提出了更高的要求,本文对此进行了介绍。 Xiluodu Hydropower Station is the largest one on the Jinshajiang river. 3 diversion tunnels symmetrical arrangement in each abut ment, in which No. 1, No. 2, No. 5, No. 6 diversion tunnel are combined with the tailrace tunnel. Each tunnel has a flow cross - section of 18m× 20m(width x height), the largest excavated section reaches 21.60m ×23.60m. Besides the low angle interlayer- intraformational shear zones endanger the tunnel crown surrounding rock stability, the tunnel working condition is complicated the design and construction of large-diameter diversion tunnels call for high requirements of design concept and technology.
作者 邱云
出处 《水电站设计》 2009年第1期4-7,16,共5页 Design of Hydroelectric Power Station
关键词 导流隧洞 尾水隧洞 设计 内力分析 溪洛渡水电站 diversion tunnel tailrace tunnel design inner force analysis Xiluodu Hydropower Station
  • 相关文献

参考文献2

  • 1成都勘测设计研究院.DL/T5195—2004((水工隧洞设计规范》[s].北京:中国电力出版社,2004.
  • 2佘成学,李建波,等.溪洛渡水电站工程导流洞(与尾水洞结合段)结构有限元计算分析[R].武汉:武汉大学水利水电学院,2005.

同被引文献2

  • 1贵州中水建设项目管理有限公司.贵州省盘县狮子河水库工程可行性研究报告[R]贵阳:贵州中水建设项目管理有限公司,2012.
  • 2蒋峰.水电站围堰拆除爆破振动控制研究[D]{H}武汉:长江科学院,2009.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部