2Cheng F-T,Shen E,Deng J-Y,Nauyen K.Development of a System Framework For the Computer-integrated Manufacturing Execution System:a distributed object-oriented approach[J].International Journal Computer Integrated Manufacturing,1999,12 (5):384-402.
3Fan Tien,Cheng Shang-Lun,Wu.Systematic Approach for Developing Holonic Manufacturing Execution Systems[C].Industrial Electronics Society,The 27th Annual Conference of the IEEE,2001 (1):261 -266.
3KARIMI N, ZANDIEH M, KAR-AMOOZ R. Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase ap- proach[J]. Expert Systems with Applications, 2009, 37 (6) : 4024-4032.
4YAGMAHAN B, YENISEY M M. Ant colony optimization for multi-objective flowshop scheduling problem[J]. Comput- ers b-Industrial Engineering, 2008, 54(3) :411-420.
5GAJPAL Y,RAJENDRAN C,ZIEGLER H. An ant colony al- gorithm for scheduling in flowshops with sequence-dependent setup times of jobs [J]. International Journal of Advanced Manufacturing Technology, 2006, 30(5/6) :416-424.
6ALEXANDROS D C, CHRISSOLEON P T. Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines [J]. European Journal of Operational Research, 2009,197(2) : 572-580.
7OMAR M K, TEO S C, YASOTHEI S. Mixed integer pro- gramming formulation for hybrid flow shop scheduling problem [C]//Proceedings of the 2010 IEEE Conference on IEEM. Washington,D. C. ,USA:IEEE,2010:385-389.
8CHEN C L, CHEN C L. A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated par- allel machines [J]. Computers & Operations Research, 2009, 36(11) ~3073-3081.
9TAVAKKOLI-MOGHADDAM R, SAFAEI N R,SASSANI F. A memetic algorithm for the flexible flow line scheduling problem with processor blocking[J]. Computers & Opera- tions Research, 2009, 36(2).. 402-414.
10LEE K J, LEE J K, CHOI S Y. A spatial scheduling system and its application to ship building: DAS-CURVE [J]. Expert Systems with Applications, 1996, 10(3/4):311-324.