期刊文献+

G305线田庄台辽河公路大桥主桥施工监控

Monitoring of Construction of Big Bridge's Main Bridge on Tianzhuangtai-Liaohe Highway of G305 Line
下载PDF
导出
摘要 如何通过对施工过程的控制,大型桥梁在建成时得到预先设计的应力状态和几何线形,是桥梁施工中非常关键和困难的问题。施工控制有两个方面的主要任务,一是使结构在建成时达到设计所希望的几何形状,二是使结构在建成时达到合理的内力状态,同时在施工过程中保证结构的安全。 The control of construction course, the stress state and geometrical linear, which had been designed in advance and have obtained after complete building, are extremely key and difficult issues in construction of bridge. Construction controlling needs fulfiling two main assignments--first is to make structure attain the geometry required by design when bridge has been built completely;Second is to make structure attain rational state of inter- nal force when bridge has been built. In addition, the structure safety must be guaranteed in the construction.
出处 《北方交通》 2009年第2期78-83,共6页 Northern Communications
关键词 田庄台 大桥 施工监控 Tianzhuangtai Bridge Construction monitoring
  • 相关文献

参考文献2

  • 1JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 2漳州战备大桥施工控制.2001.

共引文献1724

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部