详细论述了高速公路服务区综合楼"后浇带"的施工方法,对"后浇带"浇注时间的确定、"后浇带"支撑与拆除方法及成品保护、安全措施提出了详细要求和理论依据,对"后浇带"施工有一定指导意义。
The paper in detail discusses the construction method for "2nd Concrete Placing Region" of comprehensive building in service are of freeway. It still puts forward detailed requirements and theoretical basis on the region placing time, the methods for the region supporting and dismounting as well as the finished product protecting and the safety measures, which possess a definite guiding significance to professions.