粒子群算法在网络计划优化中的应用研究

原文传递
导出
摘要 平煤天安五矿位于平顶山市区西北部,1956年建矿,1958年12月31日投产。设计生产能力120万t。开采丁、戊、己三组煤层,现只开采己组煤层,井田呈东西走向,南北倾斜,服务年限64年,面积31.5km^2。
出处 《煤炭经济研究》 2009年第2期40-43,49,共5页 Coal Economic Research
基金 国家自然科学基金项目资助 项目编号:70573101 高等学校博士学科点专项科研基金资助 项目编号:20070491011 中国地质大学(武汉)资源环境经济研究中心开放基金资助 中国地质大学(武汉)优秀青年教师资助计划资助项目 项目编号:CUGQNW0702
  • 相关文献

参考文献6

二级参考文献33

  • 1Russell A H. Cash flows in networks[J]. Management Science, 1970,16(5) :357 ~ 373.
  • 2Grinold R C. The payment scheduling problem [J]. Naval Research Logistics Quarterly, 1972,19(1): 123 ~ 136.
  • 3Elmaghraby S E, Herroelen W. The scheduling of activities to maximize the net present value of projects [J]. European Journal of Operational Research, 1990,49: 35 ~ 49.
  • 4Herroelen W, Gallens E. Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects[J]. European Journal of Operational Research, 1993,65: 274 ~ 277.
  • 5Demuelemeester E, Herroelen W, Van D P. An optimal recursive search procedure for the deterministic unconstrained max-npv project scheduling problem. Technical Report, Katholieke University, 1996.
  • 6Sepil C, Kazaz B. Project scheduling with discounted cash flows and progress payments. Working Paper, Middle East Technical University,1994.
  • 7Smith-Daniels D E. Summary measures for predicting the net present value of a project. Working Paper, College of St. Thomas, 1986.
  • 8Buss A H, Rosenblatt M J. Activity delay in stochastic project networks. Working Paper, Washington University, 1993.
  • 9Yang K K, Talbot F B, Patterson J H. Scheduling a project to maximize its net present value: an integer programming approach [J]. European Journal of Operational Research, 1992,64: 188~198.
  • 10Baroum S M. An exact solution procedure for maximizing the net present value of resource-constrained projects. Ph. D dissertation,Indiana University, 1992.

共引文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部