风电场测风数据的检验、插补、延长和处理,是风电场风能资源评估的一项重要工作。不合理风速的数据处理方法:主要是通过相关分析和风切变指数的计算方法对那些不合理的测风塔数据进行处理。
It is an important work of wind energy resource evaluation wind power plant that inspection,interpolation, prolonging and treatment of anemometric dates in wind power plant, the date treatment way of unreasonable wind speed ,that is, unreasonable anemometric tower date be treated through relative analysis and calculation method of wind shear coefficient.
出处
《电力勘测设计》
2009年第1期60-66,共7页
Electric Power Survey & Design
关键词
风电场
风能
资源评估
数据处理
风切变系数
wind power plant
wind energy
resource evaluation
date treatment
wind shear coefficient