重庆朝天门长江大桥施工扣索索力监控分析 被引量:2

Monitoring Analysis about Cable Force of Deduction Tower of Chaotianmen Yangtze River Bridge
下载PDF
导出
摘要 重庆朝天门长江大桥主跨桁拱施工采用拱上爬行吊机悬臂吊装法,期间辅助以大型斜拉扣挂系统。通过建立空间有限元模型,对其施工过程进行理论分析。从理论分析、实测数据、实际施工操作三方面综合分析了朝天门长江大桥扣索初张力的控制,并对施工中各个工况下的索力实测数据进行了分析。 During the construction of Chaotianmen Yangtze River Bridge, a hoisting cantilever crane machine on the truss arch was used, assisted by a major cable-stayed system in the process. By using a space finite element model, analysis of the construction of Chaotianmen Yangtze River Bridge was accomplished. From three perspective: the theoretical analysis,the measured data and the construction operation, a comprehensive analysis of initial tension was carried on. Also the analysis of these measured data was given.
出处 《交通科技》 2009年第1期15-18,共4页 Transportation Science & Technology
关键词 朝天门长江大桥 扣索索力 动测法 有限元分析 初张力 chaotianmen Yangtze River bridge finite element analysis cable force initial tension
  • 相关文献

参考文献3

二级参考文献7

  • 1郭良友,桥梁建设,1995年,1期,61页
  • 2傅志方,振动模态分析与参数辨识,1990年,168页
  • 3季文美,机械振动,1985年,342页
  • 4戴诗良,随机振动实验技术,1984年,174页
  • 5高广义,李锡胤.中山二桥施工监测报告[R].天津港湾工程研究所,1995.
  • 6高广义,李晓军.天津彩虹大桥施工监测、监控技术试验研究[R].交通部天津港湾质量检测中心,1998.
  • 7张和水,高广义.韩庄104国道公路桥施工监测和结构试验研究报告[R].天津港湾工程研究所,1999.

共引文献62

同被引文献10

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部