摘要 110 kV多回同塔架设线路难以开展带电作业。针对110 kV双回路直线塔中相、下相绝缘子因安全间距不满足作业条件而难于实施带电更换的难题,研制了滑轮卡具、绝缘子吊点卡具等一系列新工器具,开发并实施了采用绳索滑轮组间接操作的带电更换。介绍了新工器具的设计、技术性能及应用情况。工程实践证明其使用效果好、有推广价值。 It is difficult to do live work for 110 kV multi-circuit transmission lines on the same tower. The difficulty of live replacement of middle phase insulator from 110 kV double circuit intermediate towers is insufficient safety space for live work between middle phase and bottom phase. So a series of new workpiece and instrument are developed and manufactured, such as pulley clamping tool, insulator hanging point clamping tool etc. Rope pulley block method is also developed and implemented for indirect operation of live replacement. The paper introduces the design, technical characteristics and application of new workpiece and instrument which is proven to be effective in practice and is worthy to be spread.
作者 吴志成
机构地区 泉州电业局
出处 《供用电》 2009年第1期62-64,共3页 Distribution & Utilization
关键词 带电作业 绝缘子更换 安全距离 live line work replacement of insulator safety space
  • 相关文献

同被引文献13

  • 1杨勇.带电更换110kV^220kV直线双串绝缘子的方法[J].云南电力技术,2006,34(1):45-46. 被引量:1
  • 2GB311.1-1997高压输变电设备的绝缘配合[S],1997.
  • 3DL/T966-2005送电线路带电作业技术导则[s],2005.
  • 4GB50545-2010110kV-750kV架空输电线路设计规范[S].2010.
  • 5陈国信,林丽雅.厦门电业局攻克110千伏同塔更换绝缘子难关[EB/OL].中国电力网,2007,11.
  • 6DL409-91电业安全工作规程(电力线路部分)[S].1991.
  • 7GB/T311.2-2002绝缘配合第2部分使用导则[S].2003.
  • 8GB/T20635-2006特殊环境条件高压用高压电器的技术要求[S].2006.
  • 9IEC60694-2002高压开关设备和控制设备常用规范[S].2002.
  • 10孙兵,李文和,李军田.地电位更换110kV线路小间距双回路耐张塔绝缘子串[J].电力技术,2009(11):28-33. 被引量:5