期刊文献+

基于粒子群改进BP神经网络的组合预测模型及其应用 被引量:45

Combined forecasting model based on BP improved by PSO and its application
下载PDF
导出
摘要 针对应用广泛的传统人工智能预测BP(Back propagation)神经网络自身局限以及其在处理中长期复杂预测问题中需要样本数量大、泛化能力弱等不足,提出利用粒子群算法优化BP神经网络的学习算法,在此基础上,利用灰色预测方法和自回归移动平均模型(ARIMA)时序预测对历史数据进行初步预测,对中长期预测中数据趋势项和随机项进行模拟;将初步预测的结果作为改进BP神经网络的输入,在此基础上进行训练和预测,构建基于改进BP网络的组合预测模型。以我国1978-2007年能源需求数据为样本,进行实例分析。结果表明:组合预测模型预测精度较BP神经网络、灰色预测方法和ARIMA预测方法分别提高4.8%,6.1%和5.3%,验证了组合预测方法在中长期预测问题处理中的有效性。 To solve the limitations of BP neural network in dealing with complex and long-term prediction, which needs many samples to calculate and its generalization ability is poor, the learning algorithm of BP neural network optimized by PSO (Particle swarm algorithm) was proposed. On the basis of this algorithm, the grey prediction and the ARIMA (Autoregressive integrated moving average model) time series forecasting methods were used to make a preliminary forecast for historical data. The results of initial forecasts were put as the input of improved BP neural network to be forecasted and trained. An improved BP network-based combining forecasting model was built. China's energy demands data in 1978-2007 were taken as the sample to be analyzed. The results show that the learning algorithm of BP neural network optimized by PSO has better effects in simulation of the trend data and the random data in medium- and longterm forecasting. The prediction accuracy of combining forecasting model increases by 4.8%, 6.1% and 5.3% respectively compared with those of BP neural network, gray forecasting methods and ARIMA forecasting, which proves the effectiveness of combining forecasting method in the medium-term and long-term forecasting.
出处 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2009年第1期190-194,共5页 Journal of Central South University:Science and Technology
基金 国家自然科学基金资助项目(70671040)
关键词 BP神经网络 粒子群算法 ARIMA模型 灰色理论 组合预测 BP neural network particle swarm optimization auto regression-moving average grey model combining forecasting
  • 相关文献

参考文献13

  • 1Vila J P, Wagner V, Neveu P. Bayesian nonlinear model selection and neural network: A conjugate prior approach[J]. IEEE Trans on Neural Networks, 2000, 11 (2): 265-278.
  • 2Rahman M. Analysis and evaluation of five short-term load forecasting[J]. Techniques IEEE Transactions on Power Systems, 1989, 4(4): 1484-1491.
  • 3李媛媛,牛东晓.基于最优可信度的月度负荷综合最优灰色神经网络预测模型[J].电网技术,2005,29(5):16-19. 被引量:15
  • 4Conejo A .l, Plazas M A, Espinola R, et al. Day-ahead electricity price forecasting using the wavelet transform and ARIMA models[J]. IEEE Trans Power Syst, 2005, 20(2): 1035-1042.
  • 5姚李孝,姚金雄,李宝庆,万诗新.基于竞争分类的神经网络短期电力负荷预测[J].电网技术,2004,28(10):45-48. 被引量:23
  • 6鲍正江,胡海兵.一种基于神经网络的电力负荷预测方法[J].浙江电力,2004,23(4):10-13. 被引量:10
  • 7Torre S D L, Conejo A J, Contreras J. Simulating oligopolistic pool-based electricity markets: A multiperiod approach[J]. IEEE Trans Power Syst, 2003, 18(4): 1547-1555.
  • 8Tien T L. A research on the deterministic grey dynamic model with multiple inputs DGDMMI(1,1,1)[J]. Applied Mathematics and Computation, 2003, 139(1): 401-416.
  • 9Robinson T A. Electricity pool prices: A case study in nonlinear time-series modeling[J]. Applied Economics, 2000, 32(5): 527-532.
  • 10阎平凡,张长水.人工神经网络与模拟进化计算[M].北京:清华大学出版社.2006.

二级参考文献27

  • 1袁晓辉,王乘,张勇传,袁艳斌.粒子群优化算法在电力系统中的应用[J].电网技术,2004,28(19):14-19. 被引量:218
  • 2蒋平,鞠平.应用人工神经网络进行中期电力负荷预报[J].电力系统自动化,1995,19(6):11-17. 被引量:15
  • 3冯英浚 张少仲 等.BP网络瘫痪的原因分析[J].哈尔滨工业大学学报,2000,32(5):81-83.
  • 4Hagan M T, Demuth H B, Beale M H. Neural network design[M]. Beijing: China Machine Press, 2002.
  • 5Hagan M T, Demuth H B, Beale M H. Neural network design[M]. Beijing: China Machine Press , 2002.
  • 6Larry D Paramann,Mohamed D Najar. Adaptive online load forecastin via time series modeling[J] .Electric Power Systems Research, 1995,32(3) :219- 225.
  • 7刘晨晖.电力系统负荷预报理论与方法[J].哈尔滨工业大学学报,1986,.
  • 8DC Park. M.A..EI-R.J.Marks II.L.E.Atlas, M J Damborg.Electric Load Forecasting Using an Artificial Neural Network[J]. IEEE Transactions on Power Systems, 1991, (6) :442- 449.
  • 9Kun-Long Ho. et.al.Short Term Load Forecasting of Taiwan Power System Using a Knowledge-Based Expert System [ J ] . IEEE Trans on Power Systems, 1990, 5(4): 1214 - 1219.
  • 10康重庆,夏清,沈瑜,相年德.电力系统负荷预测的综合模型[J].清华大学学报(自然科学版),1999,39(1):8-11. 被引量:91

共引文献130

同被引文献541

引证文献45

二级引证文献311

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部