摘要
1997年11月8日三峡工程成功实现大江截流,为第一阶段建设划上了句号。在过去的5年中,确立了建设管理体制和5个方面的主要管理路线,明确了工程建设与环境建设同步的指导思想。在截流实施过程中,由于技术方案合理,施工单位选择得当,航运系统的配合及项目法人的强有力领导,使大江截流高质量地完成,载入了世界建设史册。1998年至2003年的第二阶段建设即将展开,除做好技术和施工设备准备外,加强现代化的科学管理仍然十分重要,要在合同管理、质量管理、项目管理和精神文明建设上下功夫,把三峡工程建设推向一个新的水平。
:In November 8,1997,the river closure for the Three Gorges Project in the Yangtze River was successfully reached,which ends the first phrase construction of the Three Gorges Project.During the past five years,the management system for the construction and five main management routes had been established and the guiding thoughts of taking the project construction and environment building to be conducted at the same step had been defined.During the process of the river closure,due to the rational technical schemes,the proper construction units,the coordination from the navigation system and the strong leadership of the project legal person,the river closer is successfully completed with high quality which is recorded in the world construction history.The second phrase construction of the Three Gorges Project from 1998 to 2000 will be developed soon.So in addition to the preparation of technology and construction equipment,it is still very important to strengthen the modern scientific management.The efforts should be exerted to the contract management quality management,project management and the spirit civilization construction in order to push the construction of the Three Gorges Project to a new level.
出处
《水力发电》
北大核心
1998年第1期9-13,共5页
Water Power
关键词
工程建设
施工阶段
工程管理
导流
三峡工程
:project construction,construction stage,project management,diversion, Three Gorges Project