三峡工程技术设计审查进展概述

Brief Introduction to the progress of reviewing the technical design of the Three Gorges Project
下载PDF
导出
摘要 三峡工程的技术设计审查由国务院授权三峡工程开发总公司组织,总公司成立技术委员会具体负责此项工作,项目负责人和专家组长组织专家进行各专题审查。单项技术设计包括4座主要建筑物(大坝、厂房、永久船闸和升船机)、机电、二期围堰、建筑物的监测和泥沙专题。审查工作分3个阶段进行,第1阶段,对各专题的设计大纲进行审查;第2阶段,对技术设计中的关键问题、主要布置方案、结构尺寸和与之相关的科研问题与设计单位进行研究讨论;第3阶段,对各专题提出的设计报告进行审查。两年来设计审查工作进展顺利。 The examination and review of the technical design of the Three Gorges Project is organized by the china Yangtze River Three Gorges Project Development Corporation,which is authorized by the State Council.The corporation established a technical committee to be in charge of this work of examination and review.The chief of project and the head of expert team are responsible for the examination and review of various special subjects.The design of individual technology includes four main structures(dam,power house,permanent lock and ship lift),machinery and electric equipment,second phrase cofferdam,structures monitoring and sedimentation.The work of examination and review was divided into 3 stages.In the first stage,the outlines of the design of various special subjects have been examined. In the second stage,the key problems of technical design,main arrangement schemes,structural dimensions and the relative scientific research problems have been studied and discussed with the design units.Inthe third stage,the design reports put forward by the various special subject groups have been examined and reviewed.The progress of the design and review works has been advanced smoothly.
作者 程山
出处 《水力发电》 北大核心 1998年第1期20-22,35,共4页 Water Power
关键词 水利工程 技术设计 设计审查 三峡工程 large sized water project,technical design,design examination and review,Three Gorges Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部