期刊文献+

面向目标拆卸的产品复合有向图建模 被引量:4

A Product Selective Disassembly Model Based on Hybrid Directed Graph
下载PDF
导出
摘要 产品零部件选择性拆卸回收、产品维修/服务、产品零部件再制造等问题的关键是目标零部件拆卸技术。针对产品零部件目标拆卸分析的准确建模问题,提出了一个基于约束和产品拓扑组成关系的产品复合有向图模型。除有向约束之外,图模型还引入虚约束以描述拆卸问题中的复杂空间约束关系,同时提出后拆卸约束分组模型用以解决不完全拆卸问题,提出前拆卸约束分组模型用以解决多拆卸空间问题,并利用约束链概念描述约束之间的制约关系。产品复合有向图模型特别适合对目标零部件拆卸问题进行准确建模。在此基础上,建立了产品拆卸分析决策支持原型系统。最后以减速箱的拆卸为例说明了该模型及其系统的应用。 Selective disassembly is a critical technology in a lot of product life cycle issues, such as product parts/components selective disassembly/recycling, maintenance/service, and remanufacturing. Regarding to the selective disassembly modeling problem, a hybrid directed graph disassembly analysis model was proposed based on graph theory, constraints, and assembly topology concept. Topological constraints including directed constraints, virtual constraints and undirected constraints were introduced to describe the complex disassembly relationships between various sub--disassemblies. Furthermore, pre--disassembly group model and post--disassembly group model were proposed to describe the multiple disassembly scenario problem and the incomplete disassembly problem respectively. Therefore, the restricting and restricted relationships between sub--disassemblies can be described by constraint chains. The model proposed can be used in modeling product selective disassembly analysis and decision. Finally, the model's application was illustrated with a gearbox disassembly example.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2009年第5期553-558,共6页 China Mechanical Engineering
基金 国家“十一五”科技支撑计划资助项目(2006BAF02A01-03,2006BAF02A08) 山东省优秀中青年科学家奖励基金资助项目(2006BS05010)
关键词 绿色制造 目标拆卸 有向图 拆卸约束 green manufacturing selective disassembly directed graph disassembly constraint
  • 相关文献

参考文献12

  • 1Alting L, Jorgensen J. The Life Cycle Concept as a Basis for Sustainable Industrial Production[J]. Annals of the CIRP, 1993,42(1): 163-167.
  • 2Gungor A, Gupta S M. Issues in Environmentally Conscious Manufacturing and Product Recovery: a Survey[J]. Computers and Industrial Engineering, 1999, 36(4): 811-853.
  • 3Kuo T C, Zhang H C, Huang S H. Disassembly Analysis for Electromechanical Products: a Graphbased Heuristic Approach [J]. International Journal of Production Research, 2000, 38(5): 993-1007.
  • 4Suzuki T, Kanehara T, Inaba A, et al. On Algebraic and Graph Structural Properties of Assembly Petri Net [C]//IEEE International Conference on Robotics and Automation. New York: IEEE, 1993:507-514.
  • 5Huang Y F, Lee C S G. A Framework of Knowl edge- based Assembly Planning[C]//IEEE International Conference on Robotics and Automation. New York: IEEE, 1991: 599-604.
  • 6Dewhurst P, Subramani A K. Automatic Generation of Product Disassembly Sequence[J]. Annals of the CIRP, 1991, 40(1): 115-118.
  • 7Jing R L, Li P K, Shu B T. Generation of Possible Multiple Components Disassembly Sequence for Maintenance Using a Disassembly Constraint Graph [J]. International Journal of Production Economics, 2006, 102 (1): 51-65.
  • 8Homem de Mello L S, Sanderson A C. AND/OR Graph Representation of Assembly Plans[J]. IEEE Transaction on Robotics and Automation, 1990, 6 (2): 188-199.
  • 9Zussman E, Kriwet A, Seliger G. Disassembly-oriented Assessment Methodology to Support Design for Recycling[J]. Annals of the CIRP, 1994, 43 (1): 9-14.
  • 10Lambert A J D. Optimal Disassembly of Complex Products[J]. International Journal of Production Research, 1997, 35(9): 2509-2523.

同被引文献51

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部