模糊型计划评审技术在海洋结构建造工期估算中的应用 被引量:2

Application of F-PERT to Evaluation of Building Period for Ocean Structure
下载PDF
导出
摘要 根据模糊型计划评审技术的理论和方法,研究海洋工程结构建造周期的估算方法;应用模糊数学中隶属度的概念,将建造过程中各种因素(气候、人员心理、设备状况、经济制约),用定量形式表示出来,提出了更为科学的海洋工程结构建造周期估算方法。该方法对于工程结构建造周期的估算是可行的。 The evaluation method of building period was studied for ocean engineering structure based on the theory and method of fuzzy program evaluation and review technique F-PERT. The degree of membership concept in fuzzy mathematics is adopted to quantitatively express all the factors in the building progress, for example, weather,staff's psychological state, equipments condition, and economic restrictions. A more scientific evaluation method of building period is presented for ocean engineering structure. It is shown that the method is feasible to evaluate the building period for ocean engineering structure through application for a building engineering of ocean structure block.
出处 《天津大学学报(社会科学版)》 CSSCI 2009年第2期120-122,共3页 Journal of Tianjin University:Social Sciences
关键词 海洋结构 建造周期 模糊型计划 评审技术 隶属度 ocean structure building period fuzzy program evaluation and review technique membership degree
  • 相关文献

参考文献4

二级参考文献1

  • 1詹原瑞.影响图理论方法及应用[M].天津:天津大学出版社,1995..

共引文献20

同被引文献18

  • 1姚全珠,任雪利,丁晓剑.基于贝叶斯网络的计划评审技术[J].计算机工程与应用,2006,42(20):187-189. 被引量:4
  • 2Lubchenco J, McNutt M K, Dreyfus G, et al. Science in support of the Deepwater Horizon response [ J ]. Proceed- ings of the National Academy of Sciences of the United States of America, 2012, 109(50): 20212-20221.
  • 3Osi L K. BP's Deepwater Horizon Oil Spill: Engineering Failures, Environmental & Economic Impact [ D ]. New York: The Cooper Union for the Advancement of Science and Art, 2011.
  • 4BP. Deepwater Horizon containment and response: Har- nessing capabilities and lessons learned [ R ]. London : 2010.
  • 5Mathews K J. Fluid Flow and Heat Transfer in the Top Hat Oil Recovery System[ C]. Houston: 2012.
  • 6Azaron A, Ghomi S. Lower bound for the mean project completion time in dynamic PERT networks [ J ]. Euro- pean Journal of Operational Research, 2008, 186 ( 1 ) : 120-127.
  • 7胡运权,郭耀煌.运筹学教程[M].北京:清华大学出版社,2012.
  • 8杨铭,李原,张开富,沈琴,徐志勇.基于改进的计划评审技术的航空项目风险评价技术研究[J].计算机集成制造系统,2008,14(1):192-196. 被引量:5
  • 9刘景凯.BP墨西哥湾漏油事件应急处置与危机管理的启示[J].中国安全生产科学技术,2011,7(1):85-88. 被引量:23
  • 10任帆,于永利,吕学志.基于Stateflow的设备维修过程仿真研究[J].计算机工程与应用,2011,47(21):217-219. 被引量:3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部