摘要
该文主要介绍了TSP203的工作原理及其在上(海)—瑞(丽)高速公路某隧道施工中的具体应用情况。作者将TSP203的预测结果和最终开挖后的地质情况进行了详细的对比分析,说明预测结果基本正确。通过对预测结果的反馈对比分析获得一些经验教训,并提出一些新的见解,为今后的工作提供了有益的借鉴。
In this paper, the work principle of TSP203 and its application in the tunnel engineering of Shanghai - Ruili expressway is introduced. Prediction effects and the geology situation after excavation are contrasted and analyzed in detail, and prediction results are basically correct. We gain experiences through feedback analysis, and some new opinions are also proposed. It provides the Useful refrences for the later work.
出处
《勘察科学技术》
2009年第1期57-61,共5页
Site Investigation Science and Technology
基金
湖南省自然科学基金资助项目(06JJ2077)
关键词
TSP
超前地质预报
隧道
tunnel seismic prediction
advance geological prediction
tunnel