钢管混凝土柱交错桁架结构有限元分析与试验研究 被引量:10

Test and FEA of concrete-filled tubular steel column-staggered truss structure
原文传递
导出
摘要 介绍了1个3层1/3缩尺的钢管混凝土柱交错桁架结构水平加载试验,并应用ANSYS参数化程序设计语言APDL编制了钢管混凝土柱交错桁架结构非线性分析的命令流。有限元模拟与试验结果吻合较好,验证了有限元模型以及编制APDL命令流的正确性。应用编制的命令流,分析了柱的截面形式、桁架的刚度、高跨比、桁架的形式、荷载偏心等因素对钢管混凝土柱交错桁架结构性能的影响。 A 3 stories and 1/3 reduced scale concrete-filled tubular steel column-staggered truss structure model was tested under lateral load. A command stream of finite element analysis for the model is edited with the ANSYS Parametric Design Language APDL and the calculated results are much coincided with those of the test. Model of finite element and command stream are corret.The command stream was used to analyze the behaviors of concrete-filled tubular steel column-staggered truss structures with the different shape section of column, stiffness of truss, high-to-span ratio, type of truss and eccentric load.
出处 《建筑结构》 CSCD 北大核心 2009年第2期45-47,11,共4页 Building Structure
基金 国家科技部科研院所技术开发研究专项资金项目(2004EG131165) 建设部研究开发项目(2007-K2-1) 江苏省普通高校自然科学研究计划项目(07KJB560110)
关键词 钢管混凝土柱 交错桁架 有限元分析 试验 concrete-filled tubular steel column staggered truss structure finite element analysis test
  • 相关文献

参考文献5

  • 1M P COHEN. Design solution utilizing the staggered steel truss system [J]. Engineering Journal, AISC, 1986, 23(3): 97-106.
  • 2HANSEN R J, LE MESSURIER W J, PAUL P J. New steel framing system promises major saving in high-rise apartments [ J ]. Architecture Record, 1996(6).
  • 3NEIL WEXLER, FENG BAOLIN. Steel design guide series 14: staggered truss framing systems[J]. AISC, 2002(1).
  • 4.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 5CECS159:2004矩形钢管混凝土结构技术规程[S].北京:中国计划出版社,2004.

共引文献672

同被引文献53

引证文献10

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部